OK, the snow melted and I decided to get back on the build if I was going to make the Carlisle Show in May. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAggggggggggggggg!!!!!! It is so amazing how fast time flies when you are in a hurry. Let's see what is on my "to do" list.
1) Install heater hoses and radiator hoses.
2) Install power steering lines.
3) Install trans cooler.
4) Tidy up all wiring.
5) Remove surface rust and paint.
6) Install drivers seat.
7) Install purge tank.
Install upper front shock mount strut bar.
9) Bleed brakes.
10) Fab rear spoiler mount.
11) Fab rear spoiler and cover with carbon fiber vinyl.
12) Fab GTR console switch panel.
There were other things also but these were priority items to make the chassis look good and needless to say, I was extremely low on energy by the 2nd week of May.