The floor pan prices would be very difficult to get a price on separately. They are part of a larger piece.
The laser cut pieces include the alignment cams, rear bearing uprights, control arm mounts, fuel tank, steering rack mounts, ball joint mounts, coilover mounts, door hinge mounts, brake and clutch master cylinder mounts and all the sheet metal.
Order of assembly - start with the three main sections and build them first. Order does not matter. Use a laser to align the entire assembly and monitor during welding as it will bend as you are welding. It is wise to give the entire frame a bend before final welding. I'll explain......
With the frame three pieces (entire frame) tacked together turn it upside down. With a laser set it up so the center of the frame is about 1/2" higher than the two ends. When you weld all the bottom welds (top side now because it is upside down) it will pull it straight.
BTW, your sway bar mounts should align with the bottom edge, not the top.