Well, I finally pulled the trigger on a Prova Countach project I have been back and forth on for almost two years now.
Prova body, custom frame, Chev 350 mated to a G50 through a Kennedy adapter and custom axles. Corvette C4 hubs and brakes on custom suspension.
The project was pretty much built and ready to finish up and the fellow put it into storage and then had to move it outside when the storage location closed. It sat outside under a tarp for a couple years. The drive train is Chev 350 with Kennedy adapter to G50 all rebuilt before storage. The car was pretty much built at the point of work stoppage.
My job will be to take everything back to the frame and all the parts off to clean them up after sitting outside in the weather and then finish the project off. I am guessing about one year to pull apart and clean and rebuild what needs it and then who knows how long to finish it. If history serves as an indicator of how long it takes me to get the car done, I will be at it for many years......
There are a LOT of extra parts. I scoped the engine cylinders and the heads are rusty but the cylinder walls and pistons look good. I will pull the drive train out and pull the heads off and the lower end to confirm everything is still good and clean up what I need.
I pick the project up next Tuesday so more pics after I take a spray washer to it and clean the parts up.
Cheers
Don